10facts
about concern

Environment and safety
1

Safery

0

years, Russian NPPs
have not had a single
event above Level 1
of the International Nuclear
Event Scale (INES)

Production

Production performance improvement

>0%

At present, nuclear power
generation in the national
energy balance exceeds
(15,8% in 2005)

2

Power
Generation

+30%

bln kWh

bln kWh

The power output in 2015
set an absolute record
in the entire history of
Russian nuclear power plants.

3

NPP power units and Academician Lomonosov floating thermal nuclear power plant are under construction at the moment

The Novovoronezh NPP power unit No. 6 start-up, and docking trials of the floating thermal nuclear power plant are scheduled for 2016

New power units

new NPP power units
commissioned

The Kalinin NPP power unit No. 4 (2011), the Postov NPP power units No. 2 and No. 3 were started up (in 2010 and 2015 respectively). In addition, the Beloyarsk NPP power unit No. 4 with an innovative BN-800 fast breeder reactor was powered up

Capacity Factor Increase

+0,0%

At present, Russian NPPs capacity factor
is comparable to state-of-the-art
power units of foreign NPPs

4
5

The general contractor agreement made with Atomenergoremont JSC in 2011 for maintenance of power units and balance of plant equipment of NPPs allowed to optimize the maintenance campaign and costs, as well as to enhance the operations quality

Maintenance
campaign

0%

optimization of the maintenance
campaign length over a year

Labor
Productivity
Growth

x2

times growth in the Concern`s labor productivity over a decade

2005

0

mln kWh/pers

2015

0

mln kWh/pers

6
7

The Concern implements innovative
projects for nuclear power units
that were subject to theoretical
studies in mid-2000s

Scientific
research

The first (main) floating thermal
nuclear power plant (FTNPP)
rated at 70 MW on the basis
of a floating power unit with two
KLT-40S reactors. Commissioning
year - 2019. R&D activities are
carried out for substantiation
of a power unit with the BN-1200
fast breeder reactor

New Business
Lines

0bin rubles

portfolio of foreign orders
by the beginning of 2015

8

Rosenergoatom Concern transformed
from an operator company to a power
engineering division of Rosatom,
uniting subsidiaries involved in
operation and servicing of nuclear
power plants. The Concern became a professional customer that stepped
up its competence in construction and commissioning of new nuclear power capacities, a well-established player
in the global market

Rosenergoatom Concern: youtu.be/OKEgbbokKb8

Social influence
9

The average salary in the Concern
grew 4 times over a decade,
having exceeded Russia`s average
salary growth rate (3,7 times over a decade)

Salary growth

City life

0bln rubles

According to the results of 2015, 1.3 bln rubles were routed for events in municipal entities

10

Starting from 2012, agreements
were made between Rosatom
State Corporation and the governments
of the Concern presence regions.
According to these agreements,
municipal entities receive additional
tax deductions for implementation of
socioeconomic development plans.
During two years, 2.8 bln rubles
were routed for events in municipal
entities